The Lakeside Trail is illuminated by energy efficient LED lights, with snow removal during the winter months, for year-round enjoyment. Lakeside Trail continues into and continues into the North Bank Trail, provided by Spring Lake Township, which is a continuation of the Rail-Trail that extends east 3.3 miles into Spring Lake and Crockery Townships.
The North Bank Trail (NBT) is a proposed 18-mile non-motorized, multipurpose pathway located generally along the former Grand Trunk Western Railroad right of way that extends from Spring Lake to Marne, MI. The NBT will connect the east end of Lakeside Trail in the Village of Spring Lake to the southeast end of the existing Musketawa Trail, otherwise known as the Fred Meijer Pioneer Trail. Ultimately, the NBT serve as a regional link between the beaches of Lake Michigan and the Grand Rapids metro area.