Body
The first phase, a 3.3 mile stretch between Fruitport Road and 130th Avenue was completed in 2011. Work is scheduled to begin on the second phase, 4.5 miles from 130th Avenue to Polkton Township and will link to the Musketawa Trail. Eventually the proposed 18 mile, non-motorized pathway will serve as a regional link between the beaches of Grand Haven & Spring Lake area to the Grand Rapids metro area.
Features |
|
---|---|
Season(s) of Operation |
|